good news
Ninghuai Intercity Railway Construction
An update on the progress
Ninghuai Intercity Railway Station Bid No.6Continuous girder joining across Shanghai-Shaanxi Expressway
Recently, Ninghuai Intercity Railway Station 6 standard 128 meters six-lane continuous girder across Shanghai-Shaanxi Expressway was merged, which laid a solid foundation for the subsequent girder erection and bridge deck system construction.


The continuous girder is located in the lower section of Pukou girder yard, spanning G2503 Shanghai-Shaanxi Expressway.It is one of the most technically challenging bridge projects on the entire line.The project team adopted the hanging basket casting process with intelligent monitoring system to track the line shape of the girder in real time. In order to ensure the smooth merging of the continuous beam, the project department adopts the hanging basket casting process, with intelligent monitoring system to track the beam line shape and stress data in real time.Control construction errors to the millimeter level.
Huai'an Girder Yard of Ninghuai Intercity Railway Completes All Prefabrication Tasks of Box Girders
Recently, Huai'an Girder Yard, the pre-station 1 bid of Ninghuai Intercity Railway of 19th Bureau of China Railway, completed the prefabrication of all box girders.

Huai'an girder yard covers a total area of 198 acres and undertakes the task of prefabricating 1,075 simple supported girders in the tender section.It is the largest prefabricated girder yard in the whole line of Ninghuai Intercity Railway.The yard is equipped with two 180-type mixing units, 10 girder making bays and 52 girder storage bays, with a maximum storage capacity of 104 bays.
In order to ensure the successful completion of box girder prefabrication task, the project department introduces automated steel processing and production equipment, intelligent tensioning and pressurization cart, automatic maintenance spray system and other intelligent equipments; with the help of intelligent command center and informatization management platform, it monitors and controls in real time the key processes such as raw material entry, steel processing, template installation, etc., which comprehensively improves the quality of the prefabricated girder and achieves the digital intelligent management for the whole life cycle of the girder yard. management.
Ninghuai Intercity Railway, as the backbone of intercity railroad in Jiangsu Province's riverine urban agglomeration and an important part of the Yangtze River Delta intercity rail transportation network, has a total length of 179 kilometers of new lines and a design speed of 350 kilometers per hour.
After the completion of the railroad, Nanjing and Huai'an will realize 1 hour direct access, for the improvement of the regional intercity rail transportation network, enhance the railroad transportation capacity, promote the coordinated development of the regional economy along the Suwannese and accelerate the construction of the province's modern comprehensive transportation system has far-reaching significance.
