As an industrial support for the R&D Park area, the national-level Nanjing Software Park Integrated Circuit Industrial Park infrastructure enhancement project is accelerating the construction.
At present, Building 1 and Building 2 have been topped out, and Building 1 has entered the façade curtain wall construction; Building 3 and Building 5 are under roof construction and will be topped out soon; Building 4 is under construction of the fire pool and is scheduled to be topped out at the end of November. After completion, it will provide integrated supporting space for production, R&D, warehousing, etc. for integrated circuits and related enterprises, which will help the development of industrial agglomeration in the new area.
National Nanjing Software Park Integrated Circuit Industrial Park Infrastructure Enhancement Project is located in the Research Park five bridges area of the research new road, the project planning and construction of five buildings, the function of the positioning of the precise docking enterprise development requirements. Among them, Building 1, Building 2, Building 3 and Building 5 are industrial plants, and Building 4 is a control center for supporting facilities and equipment.
"Plant are built according to standardized design, the first floor height of 8 meters, the second floor and above the height of 4.8 meters, spacious spatial layout can be flexibly adapted to the use of different scenes." The project manager introduced that in the future, these rough factory buildings will be transformed into production workshops, R&D centers, IC packaging and testing workshops, warehousing and logistics workshops and other multifunctional areas according to the needs of enterprises, which can meet the needs of enterprises for large-scale production as well as carry out R&D and innovation activities.

Xiao Bei saw at the construction site, Building 1 plant is carrying out the construction of the facade decoration, "the building's facade is made of aluminum, which can better adapt to the requirements of the future internal production of the temperature." The person in charge of the project said.


The completion and commissioning of the park will not only provide specialized and diversified spatial support for enterprises in the new area, but also further improve the IC industry chain, attract upstream and downstream enterprises to gather, and provide a basic guarantee for the creation of a more competitive IC industrial ecology.
